Menu

Bolingbrook, IL

Remodeling a village built mostly after 1960

Nearly all of Bolingbrook was built after 1960, and the village had 24,408 housing units in 2020. The Promenade Bolingbrook is the village's downtown retail center, and Hidden Oaks Nature Center is run by the Park District. RL Builders does custom homes, additions and high end remodels for Bolingbrook owners.

Our office is in Lemont. Frank Lello is on site every day, you get one contact, and we build only on land you own. Our subcontractors average ten years with us. References and tours of finished RL homes are available on request.

All the Bells and Whistles, custom estate by RL Builders in Palos Park
All the Bells and Whistles, Palos Park. Built by RL Builders.

What clients say

Homeowners on working with Frank

  • Frank and his team built our dream home through COVID, and the quality has been exceptional. Years later he still checks in seasonally and stays a call or text away, which is rare and appreciated.
    Julie Morris, homeowner
  • Frank handled our kitchen renovation and we could not be happier with the final project. He was on site every day, used skilled craftsmen, and made what could have been stressful feel easy.
    Homeowner, kitchen renovation

Read more reviews on Yelp, Houzz and Facebook.

What to know before building in Bolingbrook

Bolingbrook requires permits for new construction, renovations, additions and alterations before any work begins, and applications go through the Village's online Permit Portal. The Building Division is at 375 W Briarcliff Rd and is open Monday to Friday, 8:30 a.m. to 5:00 p.m. Inspections must be requested at least three business days ahead, so plan around that. Questions about which code applies are easier to settle before the drawings are done than after.

The code situation is changing. The current residential code is the 2018 IRC with amendments, and permit submittals on or after January 1, 2027 must follow the 2024 IRC. Separately, Illinois adopted the 2024 IECC effective November 30, 2025, which lowers the maximum window and door U-factor from 0.30 to 0.28. If your plans were drawn before that, the window schedule is the first thing to check.

The submittal date is what decides it. Ask your architect which code the drawings target, and if the permit application will go in on or after January 1, 2027, the plans have to follow the 2024 IRC.

On your job, we coordinate the permits, line the plans up with the code Bolingbrook enforces, and handle electrical ourselves as a licensed electrical contractor. See upscale remodeling and additions.

Sources: Village of Bolingbrook Building Division, Bolingbrook, Illinois

FAQ

Building in Bolingbrook: questions

Which residential code applies in Bolingbrook?

The current code is the 2018 IRC with amendments. Permit submittals on or after January 1, 2027 must follow the 2024 IRC. If your submittal could fall on either side of that date, settle which version the drawings follow before they're finished.

What changed with Illinois energy code windows?

Illinois adopted the 2024 IECC effective November 30, 2025. It lowers the maximum window and door U-factor from 0.30 to 0.28. Windows and doors on plans drawn earlier need to be checked against the new number.

How far ahead do I request an inspection in Bolingbrook?

At least three business days ahead, by calling the Building Division at (630) 226-8470. Build that lead time into your schedule, because a late request can leave a crew waiting on the inspector.

Does RL Builders build in Bolingbrook?

Yes. We take on custom homes, additions and remodels in Bolingbrook. We're in Lemont, build only on land you own, and Frank Lello is on site every day.

Planning a build in Bolingbrook?

Call (708) 301-0700 or send a few details, and Frank will talk through your lot, budget and timing.