Menu

Westmont, IL

Old railroad grid, new engineering paperwork

Westmont's older core grew along a railroad line approved in the 1850s that opened in 1864 between Aurora and Chicago, and Ogden Avenue (U.S. Route 34) still follows the old plank road. RL Builders builds custom homes, additions and high end remodels in Westmont.

Frank Lello is on site every day of the job and you have one contact the whole way. References and tours of finished RL homes are available on request.

All the Bells and Whistles, custom estate by RL Builders in Palos Park
All the Bells and Whistles, Palos Park. Built by RL Builders.

What clients say

Homeowners on working with Frank

  • Frank and his team built our dream home through COVID, and the quality has been exceptional. Years later he still checks in seasonally and stays a call or text away, which is rare and appreciated.
    Julie Morris, homeowner
  • Frank handled our kitchen renovation and we could not be happier with the final project. He was on site every day, used skilled craftsmen, and made what could have been stressful feel easy.
    Homeowner, kitchen renovation

Read more reviews on Yelp, Houzz and Facebook.

What Westmont's new home packet requires

A new single-family permit submittal has to be complete at application, because partial submittals aren't accepted. It needs three bound sets of architectural plans sealed by an Illinois architect. The building application fee is 0.004 times the construction cost, with a $100 minimum, due at submittal.

New homes require fire department sprinkler plans from a qualified sprinkler system designer, since licensed architects aren't considered qualified for that. The engineering plan set must be sealed by an Illinois Professional Engineer and include grading, stormwater and erosion control, a topographic survey and a tree survey showing Tree Protection Zone fencing. Retaining walls of 36 inches or more in height need certification by an Illinois structural engineer.

Drainage gets its own review. The drainage addendum applies to new single-family construction and to additions with over 5,000 square feet of disturbance, and it requires a 2 percent minimum slope on swales along property lines. Site plans must show floodplains and wetlands within 100 feet of the property, and the topographic survey runs at least 100 feet beyond every property line.

Utilities split by location. New homes need a DuPage County stormwater permit submittal, and sanitary district applications go to Flagg Creek Water Reclamation District east of Cass Avenue and Downers Grove Sanitary District west of it. Permit requirements come from municipal code section 18-36, contractors register with the village, and a 2025 amended zoning ordinance is posted online. RL coordinates the permits and lines the plans up with the packet. See custom homes.

Sources: Westmont permitting, Westmont new single-family residence permit packet

FAQ

Building in Westmont: questions

Why do Westmont new homes need separate sprinkler plans?

New homes require fire department sprinkler plans from a qualified sprinkler system designer, because licensed architects aren't considered qualified for that. That is a separate drawing set from the architect's plans, so bring a sprinkler designer in while the house is still being designed.

Which sanitary district serves my Westmont lot?

It depends on the side of Cass Avenue. Applications go to Flagg Creek Water Reclamation District east of Cass Avenue and to Downers Grove Sanitary District west of Cass Avenue. New homes also need a DuPage County stormwater permit submittal.

What does Westmont's drainage review look at?

The drainage addendum applies to new single-family homes and to additions with over 5,000 square feet of disturbance. It requires a 2 percent minimum slope on swales along property lines, and site plans must show floodplains and wetlands within 100 feet.

Does RL Builders build in Westmont?

Yes. We take work in Westmont.

Planning a build in Westmont?

Call (708) 301-0700 or send a few details, and Frank will talk through your lot, budget and timing.